unplugged-system/build/soong/ui/status/critical_path_logger.go

74 lines
2.3 KiB
Go
Raw Normal View History

// Copyright 2023 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
package status
import (
"time"
"android/soong/ui/logger"
)
// Create a new CriticalPathLogger. if criticalPath is nil, it creates a new criticalPath,
// if not, it uses that.(its purpose is using a critical path outside logger)
func NewCriticalPathLogger(log logger.Logger, criticalPath *CriticalPath) StatusOutput {
if criticalPath == nil {
criticalPath = NewCriticalPath()
}
return &criticalPathLogger{
log: log,
criticalPath: criticalPath,
}
}
type criticalPathLogger struct {
log logger.Logger
criticalPath *CriticalPath
}
func (cp *criticalPathLogger) StartAction(action *Action, counts Counts) {
cp.criticalPath.StartAction(action)
}
func (cp *criticalPathLogger) FinishAction(result ActionResult, counts Counts) {
cp.criticalPath.FinishAction(result.Action)
}
func (cp *criticalPathLogger) Flush() {
criticalPath, elapsedTime, criticalTime := cp.criticalPath.criticalPath()
if len(criticalPath) > 0 {
cp.log.Verbosef("critical path took %s", criticalTime.String())
if !cp.criticalPath.start.IsZero() {
cp.log.Verbosef("elapsed time %s", elapsedTime.String())
if elapsedTime > 0 {
cp.log.Verbosef("perfect parallelism ratio %d%%",
int(float64(criticalTime)/float64(elapsedTime)*100))
}
}
cp.log.Verbose("critical path:")
for i := len(criticalPath) - 1; i >= 0; i-- {
duration := criticalPath[i].duration
duration = duration.Round(time.Second)
seconds := int(duration.Seconds())
cp.log.Verbosef(" %2d:%02d %s",
seconds/60, seconds%60, criticalPath[i].action.Description)
}
}
}
func (cp *criticalPathLogger) Message(level MsgLevel, msg string) {}
func (cp *criticalPathLogger) Write(p []byte) (n int, err error) { return len(p), nil }